Is it possible to change the order of the units in the mouse-over stack viewer?
Currently they are positioned from right to left when viewing the the stack from top to bottom.
I would like to reverse this so the top-most piece is on the left, the second in the stack to its right, etc.
I have searched for this functionality but can’t find it.
The specific example:
I’ve created a lineup for a baseball game. When I hover over the stack, the #9 hitter shows up on the left and the #1 hitter is all the way to the right. It’s a bit disorientating. I’d like to ‘flip’ the stack so that the #1 hitter is on the left on down to the #9 hitter on the extreme right.
Thanks!